Tuesday 14th Jan

Electrical pretty much done. Some plumbing has been done such as toilets and bath. Intercom system is awesome can't wait to use it. 
Some sinks installed. 
Insulation installed in roof. 
Wall lights looking fantastic and in general happy with the progress the last week. Outside we now have a garage door and Downpipes. 
Front door has been painted and looks good. Theatre has been painted a very dark grey almost black on all walls and ceiling, makes for a stunning look. 

Things doing this week:
Plumbers installing remaining sinks and tapware. 
Electricians fixing a few powerpoints that were at wrong heights and some replacement points where doubles were installed instead of quads. 
Stone bench/waterfall sides on island bench should be installed. 
Plumbers to fix off Downpipes to storm water connection. 
Cabinet doors to be reinstalled in kitchen.
Plasterers to fix square set and thee plastering issues. 
 
We also have an estimated finish date of mid Feb!