Wiring/Electrical is mostly done. Again working off old plans. Dropped by and gave them the correct plans. No major issues just points at wrong heights and some missing.  The electrical guys were great about it and accepted the changes to the correct plans. 
Framers coming back Monday to fix up a few issues and redo the frame at laundry as the slider door was in the wrong location by about 1 metre. Of course this then stuffed up the electrical with our laundry internal light switch Placed in the hallway, this will need to be rectified once the slider is re framed. 
We also received a big lockup invoice mid last week but there is still no front door. So not at lockup and hence won't be paid until it is at lockup. 
We have weekly onsite meetings now!
New home inspections are doing a pre-plaster report on Friday.